RSA-1 heavy-duty metal road stud with shank
No images match this selection.
Physical product
Heavy-duty aluminium road stud for demanding applications, tested by SABS to SANS 1442:2008.
The RSA-1 is a heavy-duty aluminium road stud designed for demanding applications. Introduced in 2012 as an upgrade to the KT-303, it was tested by SABS and passed SANS 1442:2008, edition 1.3.
Installation requirements
Use approved epoxy and follow the current model-specific installation instructions. Minimum installation hole: 24 mm diameter × 65 mm depth.
Road Stud Installation and Site Preparation
1. Ensure a safe work environment: Implement traffic control measures to keep vehicles away from the work crew and ensure the safety of all personnel on site.
2. Mark the installation positions: Identify and mark the positions according to road authority standards. Improper placement can confuse drivers and cause accidents.
3. Drill the holes: Drill into the asphalt at the marked positions to a minimum dimension of 24 mm diameter × 65 mm depth (a 26 mm SDS Max drill bit is recommended).
4. Clean and dry the holes: Ensure each hole is free of debris and moisture. Any obstruction will hamper the installation, and surface oils or chemicals will prevent the epoxy resin from adhering properly.
5. Mix and apply the epoxy: Open both containers in the kit. Add the contents of the smaller container into the larger tub and mix thoroughly. Pour a sufficient amount of the mixed epoxy onto the hole, then push the stud shank firmly through the glue. Ensure enough epoxy displaces upward to completely coat the underside of the stud and secure the shank. Always wear protective gloves when handling epoxy resin.
6. Align the stud: Align the road stud precisely so the reflective lenses directly face oncoming traffic. Misalignment creates a serious hazard, as drivers will not be able to clearly see the reflective lens, which can lead to accidents.
7. Clean excess adhesive: Scrape away any overflow epoxy and return it to the mixing tub for later use. Take extreme care not to allow excess adhesive to carry over onto the reflective lenses, as this will compromise their visibility.
8. Inspect the installation: Perform a final quality check on the installed studs to ensure professional workmanship.
9. Protect the site: Keep traffic away from the newly installed studs until the epoxy is fully dry. Curing typically takes approximately one hour, depending on the ambient temperature and the type of epoxy used.
10. Always remember: Work safe, Work accurate, Work efficiently.
- Lens
- PMMA acrylic
- Shell
- Aluminium
- Filling
- High-density plastic resin (HDP)
- Pricing
- Excluding VAT
- Box weight
- 13.7 kg
- Stud weight
- 252.1 g
- Box quantity
- 40 studs
- Construction
- Aluminium composite stud with metal shank
- Product code
- RSA-1
- Pallet weight
- 568 kg
- Pallet quantity
- 1,600 studs
- Shank length / diameter
- 50 mm / 24 mm
- Box dimensions (L × W × H)
- 48 × 29 × 23 cm
- Stud width / length / height
- 125 mm / 90 mm / 22.7 mm
- Pallet dimensions (L × W × H)
- 110 × 110 × 127 cm